Prolongation Costs in Construction Contracts: What It Means and How to Manage Delays

Anna Marie Goco
By
Anna Marie Goco
Nov 25, 2024
Prolongation Costs in Construction Contracts: What It Means and How to Manage Delays

Delays in construction projects can feel like a storm cloud over an otherwise clear horizon. They disrupt schedules, inflate costs, and strain relationships between contractors and clients. One term that emerges frequently in these situations is prolongation costs. This is a key concept that contractors and project owners must understand and navigate carefully.

So, let’s break down what prolongation costs are, their impact, and practical steps to manage delays effectively.

But first, let’s lay the groundwork.

What Are Prolongation Costs?

Prolongation costs are additional expenses incurred when the duration of a construction project is extended beyond its original schedule. These costs often stem from delays caused by factors outside the contractor’s control, such as late design changes, supply chain disruptions, or client-related delays.

Imagine a contractor planned to complete a project in 12 months, only to face a two-month delay due to late materials delivery. During this extended period, the contractor still needs to cover costs for site supervision, equipment rental, and temporary facilities. These unforeseen expenses fall under prolongation costs.

Key Characteristics of Prolongation Costs

  • Direct Link to Delays: Arise only from delays beyond the contractor's control.
  • Actual Costs Only: Must be based on real, documented expenses.
  • Exclusion of Profit: Typically exclude loss of profit unless explicitly allowed in the contract.
  • Time-Sensitive Claims: Require timely notification and compliance with contract terms.

The Role of Prolongation Costs in Construction Contracts

Prolongation costs are a vital element of contract administration. They ensure fairness between contractors and project owners when delays occur. Most construction contracts include provisions to address delays and their associated costs, but the specific terms can vary significantly.

Contracts often require contractors to promptly notify the principal of potential delays and provide detailed claims supported by documentation. Failing to meet these requirements can result in denied claims, regardless of their legitimacy.

Components of Prolongation Costs

Prolongation costs cover the extra expenses arising when a construction project takes longer than expected. These costs come from different parts of the project, and understanding them helps contractors and project owners handle claims more effectively.

On-Site Overheads

On-site overheads are the extra costs of keeping the construction site running during the delay. This includes paying salaries for site supervisors, renting equipment for longer than planned, and maintaining temporary utilities like electricity, water, and internet. For instance, if a crane was meant to be rented for six months but the project gets delayed by two months, the cost of keeping that crane on-site adds to the prolongation costs.

Off-Site Overheads

Delays also impact costs outside the construction site. These off-site overheads include the salaries of project managers and office staff who continue to work on the project and the cost of office operations like reports and coordination. For example, if a project drags on, the contractor’s head office still needs to support it, leading to extra expenses.

Loss of Productivity

Delays can disrupt the rhythm of work, making teams less efficient. Workers may need to pause, reschedule, or take on other tasks, which slows down overall productivity. For example, suppose a construction team has to wait for materials to arrive. In that case, they might end up doing less work than planned during that time, which increases costs.

Increased Labor and Material Costs

When a project runs longer than expected, prices can go up. Labor rates might increase, especially if the delay overlaps with a busy season. Similarly, materials like steel or concrete might cost more if market prices rise. For example, suppose a delay pushes material purchases to a period of higher demand. In that case, the contractor will end up paying more than originally budgeted.

Subcontractor Costs

Subcontractors, like electricians or plumbers, are also affected by delays. They may need to stay on the project longer or rearrange their schedules, which can lead to extra charges. For example, if a plumber’s work is delayed because the site isn’t ready, they might charge the contractor for the extra time they had to wait.

Other Unexpected Costs

Sometimes, prolongation costs come from unexpected sources. For example, storing materials that can’t yet be used because of a delay, or protecting unfinished parts of the project from bad weather, can add to the overall expenses. These costs depend on the project and the reasons for the delay.

How to Manage Delays and Mitigate Prolongation Costs

Delays in construction projects are often unavoidable. However, with the right approach, their impact can be reduced. Managing delays effectively means planning ahead, staying organized, and following the terms of the contract. Let’s explore some practical strategies to control delays and prolongation costs.

Start with Clear Communication

Good communication is key to managing delays. From the beginning, all stakeholders should stay informed about risks, progress, and potential issues. If a delay is likely, notify everyone involved as soon as possible. For example, if materials are delayed, informing the project owner and subcontractors early allows schedules to be adjusted.

Regular updates, such as weekly meetings or email reports, help keep everyone on the same page. Clear communication avoids misunderstandings and ensures that small problems don’t turn into big delays.

Stick to the Contract

Most construction contracts include rules about how to handle delays. These often require contractors to notify the principal within a set timeframe and provide evidence of the delay. For example, you might need to include cost breakdowns or time-impact analyses.

Following these rules is crucial. If you miss a deadline to file a delay notice, even a valid claim might be denied. So, review your contract clause carefully and ensure all your actions comply with its terms.

Keep Detailed Records

Good records are essential when claiming prolongation costs. They prove what caused the delay and show how much extra time and money were spent. Maintain daily logs of work completed, site conditions, and correspondence with clients or subcontractors.

For example, if bad weather delays your work, keep weather reports, site photos, and updated schedules. This documentation makes your claim stronger and more credible.

Use Technology to Your Advantage

Project management tools are helpful for staying on track. Software like Mastt allows you to monitor timelines, track delays, and adjust resources. For instance, if one part of the project is delayed, the software can show how it will affect other tasks.

By spotting problems early, you can make changes to avoid bigger issues. Technology helps you manage delays efficiently and keeps everyone informed.

Plan for Risks

Even with the best planning, surprises can happen. That’s why including extra time and resources in your schedule is important. For example, you can plan buffer periods between critical tasks to handle unexpected delays like late material deliveries.

As the project progresses, review your plans regularly. Identify new risks and adjust your approach to keep everything running smoothly.

Work Together with Stakeholders

Delays affect everyone involved in the project, from subcontractors to project owners. Solving problems as a team can make a big difference. For instance, if a design change causes a delay, you can work with subcontractors to adjust tasks and reduce downtime.

Building strong relationships helps create trust and teamwork. When issues arise, a collaborative approach often leads to faster solutions than pointing fingers.

Manage Resources Effectively

Delays can create bottlenecks if resources aren’t managed well. Keep track of labor, equipment, and materials throughout the project. When delays happen, reassign workers or redistribute equipment to keep productivity high. For example, if workers are waiting on a delayed task, they can move to another part of the project temporarily.

By staying flexible, you can avoid idle time and reduce the costs of delays.

Common Challenges in Prolongation Cost Claims

Prolongation cost claims are rarely straightforward. Contractors often face hurdles that require careful navigation.

Concurrent Delays

When both parties contribute to a delay—such as a contractor falling behind while waiting on client approvals—it can be challenging to allocate responsibility. Contracts should clearly address how concurrent delays are handled to minimize disputes.

Proving the Costs

Contractors must prove that a delay occurred and that the incurred costs were reasonable and necessary. This requires precise record-keeping and adherence to contract terms.

Contractual and Legal Disputes

Even well-drafted contracts can lead to disagreements over ambiguous terms or differing interpretations. Working with experienced legal and contractual experts helps mitigate these risks.

Final Word

Delays and prolongation costs are a reality in construction projects. But they don’t have to derail your success. By understanding what drives these costs and taking a proactive approach, contractors and project owners can confidently navigate challenges. The key lies in clear communication, meticulous documentation, and a strong grasp of the contract’s provisions.

More importantly, construction is about more than just completing projects. It’s about building trust and fostering collaboration. When everyone works together and takes responsibility, delays can become opportunities to innovate and strengthen partnerships.

Anna Marie Goco

Written by

Anna Marie Goco

Anna is a seasoned Senior Content Writer at Mastt, specialising in project management and the construction industry. She leverages her in-depth knowledge to create valuable content that helps professionals in these fields. Through her writing, she contributes to the company's mission of empowering project managers and construction professionals with practical insights and solutions.

LinkedIn Icon

Powering Construction Project Management with easy-to-use tools